Banting Memorial
Client: Simcoe County School Board
Location: Alliston Ontario Project
Project consisted of a complete renovation of an existing automotive shop to construct a commercial grade culinary instruction area.

CULTURAL / LIFESTYLE

Don Beer Arena
Location: Pickering Ontario
Client: The City of Pickering

The Don Beer Arena project was composed of a 513 square meter addition and a 720 square meter renovation. The scope of work included renovated dining facilities, new change rooms and a new front entrance.

CULTURAL / LIFESTYLE

The York Centre for Children, Youth and Families
Location: Richmond Hill Ontario
Client: York Region District School Board

The York Centre project involved a 1386 square meter addition as well as a 598 square meter renovation. The project consisted of a new single story expansion with mechanical penthouse. The interior renovation was conducted in a heritage designated building, requiring extensive underpinning and refurbishment.

EDUCATIONAL

Alliston Union Public School
Location: Alliston Ontario
Client: Simcoe County District School Board

Alliston Union is a brand new three story elementary school. The building is composed of 5100 square meters and featured extensive site work. Deciantis Construction was the general contractor throughout the project. The project was completed on schedule with a duration of only fifteen months from start to finish.

EDUCATIONAL

Ernest Cumberland P.S
Location: Alliston Ontario
Client: Simcoe County District School Board

The Ernest Cumberland project was composed of a 390 square meter expansion, new stairwell and a 200 square meter renovation. The project involved extensive use of helical piles during foundation construction due to unstable soils. The project was completed on schedule with a duration of four months.

EDUCATIONAL

Monsignor Fraser College
Location: Scarborough Ontario
Client: Toronto Catholic District School Board

The Monsignor Fraser College project is composed of a single story 560 square meter addition. Work was done while the building was occupied without disruptions to students or staff. The project featured many architectural features including exposed p-lam beams and polished masonry walls.

EDUCATIONAL

Herbert Carnegie P.S
Location: Vaughan, Ontario
Client: York Region District School Board

Deciantis Construction Ltd undertook this challenging project in which a 744 square meter second story addition was built above an existing one story building. The existing building remained occupied for the duration of the project with minimal disturbance to occupants. This was the third project of its kind undertaken by our firm.

MANUFACTURING / INDUSTRIAL

Patheon Inc
Location: Whitby Ontario

This project involved a 1672 square meter expansion of an existing pharmaceutical facility inclusive manufacturing, laboratory and office facilities. The project required strict containment to keep the day to day operations of the facility uninterrupted. The project was completed on an accelerated schedule of 13 months without any downtime of the facility.

MANUFACTURING / INDUSTRIAL

Pullmatic Press Pit
Location: Unionville Ontario
Client: Pullmatic Manufacturing

This project involved the construction of a new press pit and mezzanine within and existing auto part manufacturing facility. The project involved extensive excavation, caissons, shoring concrete forming, environmental liners, epoxy coatings and structural steel work. Work was done with minimal disruption to production with a work area designed to minimize contamination of the surrounding equipment.

COMMERCIAL

235 Industrial Pkwy Aurora
Location: Aurora, Ontario
Client: Private Ownership

235 Industrial Parkway is a 4,750 square meter mixed use commercial building. Deciantis Construction Ltd was contracted to construct the project for a group on investors looking to invest in a growing York Region economy.

COMMERCIAL

Powel Contracting Ltd Head Office
Location: : Stouffville, Ontario
Client: Powel Contracting Ltd.

Deciantis Construction Ltd was contracted by Powel Constructing to build their new head office building. The building features 2,550 square meters of industrial shop space. It also features 1,150 square meters of office space.

EDUCATIONAL

Saint Julia Billiart Catholic School
Location: Markham, Ontario
Client: York Region Catholic District School Board

This project involved a 1672 square meter expansion of an existing pharmaceutical facility inclusive manufacturing, laboratory and office facilities. The project required strict containment to keep the day to day operations of the facility uninterrupted. The project was completed on an accelerated schedule of 13 months without any downtime of the facility.